Advanced Automation & Engineering Ltd.

Testing, Reporting & Compliance

Calibrated electrical testing, clear reporting, and compliance packs for utilities, auditors, and insurers — aligned to NETA/ANSI, IEC/BS and BNBC.

Prove Safety. Verify Performance. Pass Inspections.

AAEL conducts comprehensive electrical tests for new installations and existing facilities, documenting results in structured, auditor-friendly reports. From insulation to earth resistance and relay injection, our calibrated instruments and procedures give you evidence-backed compliance and actionable remediation notes.

What We Cover

Installation Testing

IR/PI, continuity, polarity, loop impedance, RCD/ELCB tests for panels, circuits and equipment before energization.

Power Equipment

Transformer TTR & winding resistance, contact resistance, primary/secondary injection, protection relay checks.

Earthing & LPS

Earth resistance (3-point/4-point), soil resistivity, continuity/bonding verification and SPD installation verification.

Thermography

Infrared scans for hot spots on busbars, breakers and terminations with severity grading and corrective actions.

Compliance Reports

NETA/ANSI-styled sheets, photos, labels, and summary dashboards for management and inspectors.

Periodic Audits

Planned preventive checks and re-certification to keep facilities safe and audit-ready year-round.

Typical Tests We Perform

  • Insulation Resistance (IR) & Polarization Index (PI)
  • Continuity, polarity & loop impedance
  • RCD/ELCB trip times & current verification
  • Earth resistance (3-point), soil resistivity (Wenner 4-point)
  • Transformer TTR, winding & contact resistance
  • Primary/secondary injection, relay & metering checks
  • Thermographic survey & load-imbalance analysis
  • Visual inspection, torque checks & labeling review
All instruments are periodically calibrated; certificates appended to the report bundle.

Deliverables & Compliance Pack

  • NETA/ANSI formatted test sheets & summary dashboard
  • Photos, IR images & measurement screenshots
  • Pass/fail criteria & remediation plan with priorities
  • Utility/inspector sign-off support documents
  • Calibration certificates of test equipment

How We Deliver

01

Plan

Scope, safety plan, test matrix & schedule.

02

Isolate

LOTO, permits & coordination with operations.

03

Test

Execute procedures with calibrated instruments.

04

Analyze

Compare against standards & OEM limits.

05

Report

Structured sheets, photos & remedial notes.

06

Closeout

Walkthrough, labels & compliance sign-off.

Standards & Guidelines

We reference the following codes and best practices during testing and evaluation:

NETA/ANSI IEC / BS IEEE BNBC OEM Manuals

Where This Is Used

  • New installations before energization & utility inspection
  • Periodic audits for factories, high-rise & commercial sites
  • Insurance or buyer compliance verifications

Frequently Asked Questions

Several checks (thermography, visual audit, some metering) are no-shutdown. However IR, continuity and injection tests usually require controlled isolation and permits.
Yes. Every non-conformity is tagged with severity, root cause, and recommended fix — prioritized as Critical/High/Medium/Low.
Absolutely. We bundle the test sheets, calibration certs, and photos required for utility and fire-service inspections and attend site during review.

Need a compliance-ready test report?

Book calibrated testing and a clear action plan from our engineering team.